Short answer
RFIs and submittals can often be prepared for licensing, but only after two checks: who holds rights to the project records, and which fields carry confidential or personal details. Review owner names, site addresses, security-sensitive drawings, subcontractor contacts, stamps and costs. Keep the question, the reasoning, the response and the outcome, which carry the technical value.
Key takeaways
- The owner-architect or owner-engineer agreement decides rights before any field review starts.
- Owner names, site addresses and building use can identify a project even when the project name is removed.
- Security-sensitive projects are excluded whole, not cleaned drawing by drawing.
- Personal details sit in distribution lists, markups, stamps, seals and email chains around each RFI.
- The question, the reasoning, the response and the schedule or cost effect are the parts worth keeping.
Why are RFIs and submittals worth the review effort?#
RFIs and submittals are worth the review because they record expert judgment in a structured, dated form. An RFI states a field problem, the designer's reasoning and the answer; a submittal review shows how an engineer checked a product, a shop drawing or a calculation against the design intent and what was approved, revised or rejected.
That sequence is hard to find anywhere else, and it is what developers of tools for document review, coordination and code compliance want to learn from. The same records, though, carry client identities, site details and many people's names, so the review decides whether the value can be kept without exposing anyone.
Who controls the records before anyone reviews fields?#
The project contracts control the records, so a rights check comes before any field review. The owner agreement may assign ownership of instruments of service, grant the owner a license, or impose confidentiality on everything produced for the project; consultant and subconsultant agreements add their own terms.
Standard forms help the designer's position on some points. AIA A201-2017 Section 1.5.1 deems the architect and its consultants the authors and owners of their instruments of service, including drawings and specifications, and says contractors, subcontractors and suppliers do not own or claim copyright in them. A201 also says that submitting or distributing instruments of service to meet regulatory requirements or for other project purposes is not publication in derogation of those reserved rights.
Engineering forms can read differently. Excerpts of EJCDC E-500 grant the owner a limited license to use the documents on the project and related uses, with reuse for other purposes at the owner's risk, while some negotiated versions transfer the documents to the owner after full payment. Either way, authorship of the drawings does not settle confidentiality or the owner's interest in its own project information, so the signed agreement for each project governs.
Sort projects into three groups before any preparation: those where the firm's rights and confidentiality terms clearly allow a license of cleaned records, those that need owner consent, and those that are excluded. Only the first group moves on to the field review.
- 01Your work records
- 02Personal details removed
- 03You approve the release
- 04Licensed to AI developers
Field review list for RFIs and submittals#
The field review list below covers the content that most often needs a decision in an RFI or submittal log. Most of the fields are easy to treat; the judgment calls are building use, drawings and cost.
Relative project days deserve a word. Replacing calendar dates with days from notice to proceed keeps the timing that matters, such as how long an RFI sat in review or how many revision cycles a shop drawing needed, while removing the anchor that lets someone match the project to a public permit or news story.
| Field or content | Risk | Treatment |
|---|---|---|
| Project name and number | Identifies the project and client | Replace with project code |
| Owner or client name | Confidential relationship | Replace with client type, such as private developer |
| Site address | Identifies the building | Generalize to region and climate zone |
| Building use and tenant | Can identify a well-known building | Generalize to building type |
| Drawings and sheet references | May reveal security or proprietary design | Keep sheet type references; exclude images unless reviewed |
| Subcontractor and consultant names | Commercial relationships | Replace with trade or discipline code |
| Individual names, emails and phones | Personal details | Replace with role |
| Stamps, seals and license numbers | Identify a licensed professional | Remove |
| Product and manufacturer names | Usually public | Keep, unless tied to a confidential substitution |
| Spec section and code references | Low | Keep |
| Cost and change order amounts | Commercially sensitive | Remove or replace with a relative band |
| Dates | Can identify a project when combined | Shift to relative project days |
Which projects should be excluded whole?#
Projects with security-sensitive content should be excluded whole, because no field-level cleaning reliably removes what makes them sensitive. That includes facilities where drawings show security systems, access control layouts, structural vulnerabilities or utility and communications infrastructure, as well as government, defense and law enforcement work.
The same applies when the owner agreement imposes strict confidentiality, when the project is subject to export controls, or when the building is so distinctive that its type and region alone identify it. A stadium, a hospital campus or the only high-rise in a small city cannot be hidden behind a project code.
Excluding a project removes its RFIs, submittals, markups and correspondence together. Partial inclusion invites someone to reassemble the project from the pieces that remain.
Where do personal details hide around each RFI?#
Personal details hide in the workflow around each RFI more than in the question itself. Construction platforms record who asked, who answered and who was copied, and every attachment carries its own author data.
PDF metadata is the detail most often missed. Files exported from Bluebeam, Revit or a scanner carry author names, company names and sometimes file paths in their document properties, so strip metadata from any file that survives the review, even when the visible page looks clean.
- Procore RFI ball-in-court, distribution lists and responses with names and companies.
- Bluebeam markups and comments that store the author's name with each annotation.
- Transmittals and submittal cover sheets with contact blocks.
- Professional stamps and seals on calculations and shop drawings.
- Email chains saved to the project record, with signatures and phone numbers.
- Meeting minutes and field reports that list attendees and site contacts.
- Photos from site walks showing workers, vehicles and signage.
Illustrative: a structural engineering firm reviews its RFI archive#
Illustrative: a fictional structural engineering firm keeps RFIs and submittal reviews in Procore and Bluebeam, with project files on a shared server indexed by its Deltek project numbers. The managing principal wants to license the RFI and submittal history from its commercial and multifamily work.
The rights review sorts projects by contract. Projects under the firm's standard agreement with a permissive confidentiality clause move forward; projects for one repeat developer whose agreement prohibits disclosure are held for consent; a courthouse, a utility substation and a data center are excluded on security grounds.
For the remaining projects, the team codes projects and clients, generalizes sites to region, replaces names with roles, removes stamps and seals, and shifts dates to project days. Markup images are excluded, while the text of each markup comment is kept after cleaning. The package preserves every question, response and revision cycle.
How SourceX approaches AEC project records#
SourceX handles project records through the SourceX five-step transaction: the Rights step sorts projects by contract and confidentiality terms, and the Preparation step applies the field review to what remains. The managing principal approves the project list and the field treatments before Delivery.
The SourceX Evidence Packet records which projects were excluded and why under licensing rights, and the field treatments under the privacy record, so the firm has a clear account it can show a client who later asks.
Frequently asked questions
Do we need the owner's permission to license RFIs?
Sometimes. It depends on the owner agreement's ownership, license and confidentiality clauses. Some agreements give the designer room to use project information with identifying details removed; others prohibit any disclosure. Counsel should read the clauses for each project group before preparation starts.
Can manufacturer product data in submittals be licensed?
Usually not as documents. Product data sheets, installation guides and test reports belong to the manufacturers, and they add little beyond what is already public. Keep the reviewer's comments and the product and spec references, and exclude the manufacturer's attachments.
Are public projects easier because their records are public?
Not necessarily. Public projects can carry security restrictions, and agencies often limit release of drawings for critical facilities. A public record also makes a project easier to identify, so code and generalize public projects the same way, and exclude sensitive facility types.
Should we keep spec section numbers and code references?
Yes. Spec sections, code sections and standard references describe the technical subject of an RFI without identifying the project. They are among the most useful fields for anyone building tools that check documents against specifications.
What about RFIs written by the contractor?
Contractor-authored questions are part of the project record you hold, but the contractor may have its own confidentiality expectations. Code the contractor, remove individual names, and keep the question text after cleaning, since it shows how field problems are described.
Are BIM models and Revit files in scope?
Usually not in a first package. Models embed the full design, client information, consultant names and file history in one place, which makes them hard to clean and closely tied to the owner's rights. Start with RFI and submittal text, and treat models as a separate decision with counsel.
Sources
- AIA A201 provides that submittal or distribution of the Instruments of Service to meet official regulatory requirements or for other Project purposes is not to be construed as publication in derogation of the Architect's or consultants' reserved rights. A201-2017 Section 1.5.1 states that the Architect and the Architect's consultants are deemed the authors and owners of their Instruments of Service, and that the Contractor, Subcontractors, Sub-subcontractors and suppliers shall not own or claim a copyright in them. Source
- EJCDC E-500 excerpts grant the Owner a limited license to use the Documents on the Project, extensions of the Project and related uses, and make reuse for other purposes without the Engineer's written verification or adaptation at the Owner's sole risk. Source
Related resources
- QuestionDo AI labs buy legal documents?
- InsightShould you delete old data or keep it for AI?
- InsightDo you need client consent to license de-identified RFIs and submittals?
- InsightCan a distributor license its pricing and quote history?
- IndustryBPO & contact centers data
- IndustryRecruiting & staffing data
See if your company qualifies
A short company assessment. No data uploads are needed.